Concepts, walkthroughs, and references for the parts of Caladia that benefit from a written explanation.
Open the app, load a template, walk through the five tabs, run your first simulation, and save a .cala file. Fifteen minutes, end-to-end.
Concepts feeds Getting Started; the others are the reference pages you come back to. Each is short and self-contained.
P80, critical path, sensitivity, and parallelism — what the numbers Caladia surfaces actually mean.
Triangular, PERT-beta, normal. When to use which, and how to translate expert estimates into shape parameters.
Working calendars, resource pools, conflict policy, and how multi-resource activities pick their effective calendar.
Resource rates, fixed costs, activity crashing, the cost tornado, and the budget-probability tile — how every simulation produces a cost distribution alongside the schedule.
Iterative work, pass-probability reviews, and the kickout conditions that bound how long a loop can run.
Importing from MS Project, Excel, or slide decks via the portable LLM authoring skill — bring your own model.
The .cala schema, validation rules, and the version-pin policy.